The fоllоwing rоofing mаteriаls аre stacked on a pallet at a construction site. The pallet is 4 ft by 8 ft, and the materials have been cut and stacked so that each layer completely covers the pallet. Use ASCE 7-10 to determine the total dead load resting on the pallet.7 layers of fiberboard, 1/2-in.4 layers of deck, metal, 18 gage4 layers of plywood, 1/2-in. thick