The AASHO Road Tests ushered in the Age of _________________________________. How did they do this?
Category: Uncategorized
We discussed eight reasons that owners prefer Design-Build (…
We discussed eight reasons that owners prefer Design-Build (D-B) to Design-Bid-Build. List four of them.
The Master Builder entered the ___________ century as the pr…
The Master Builder entered the ___________ century as the predominant delivery system for highway and road building. (Answer is a number)
Explain the difference between a PM and a CM. Please use al…
Explain the difference between a PM and a CM. Please use all of the things that we discussed – not just one difference
Describe why it could be said that the emergence of the Desi…
Describe why it could be said that the emergence of the Design-Build delivery system in the 1990s was “Back to the Future.”
Proponents of 3P claim that this delivery system offers inno…
Proponents of 3P claim that this delivery system offers innovation through four channels. Name two of these channels (hint: we refuted all four of these in class).
Of these 10 types of people (referred to in Question 5), whi…
Of these 10 types of people (referred to in Question 5), which kind is USUALLY the instigator of the project?
Label the four phases of a constructed structure (project),…
Label the four phases of a constructed structure (project), in chronological order, below. A – _____________________________________________ (first) B – _____________________________________________ C – _____________________________________________ D – _____________________________________________ (last)
In the Construction Phase of a project, the DP can be made r…
In the Construction Phase of a project, the DP can be made responsible for four tasks. Name three of them.
Name two other terms by which this delivery system is known….
Name two other terms by which this delivery system is known. The __________________________________ System The __________________________________ System