The population of a country between 1921 and 2008 with proje…

The population of a country between 1921 and 2008 with projections to 2010 can be modeled as  [c1]([c2]) million people where is number of years since 1900.  What is the average population of this country from 19[year1] to 19[year2]?  The units of your answer should be million people. (Hint: this is a direct application of the average value formula) Round your answer to two decimal places. 

Name Notation Units Comment Memory footprint -…

Name Notation Units Comment Memory footprint – Bytes Total space occupied by the program in memory Execution time (∑ CPIj) * clock cycle time, where 1 ≤ j ≤ n Seconds Running time of the program that executes ninstructions       Arithmetic mean (E1+E2+…+Ep)/p Seconds Average of execution times of constituent pbenchmark programs       Weighted Arithmetic mean (f1*E1+f2*E2+…+fp*Ep) Seconds Weighted average of execution times of constituent p benchmark programs       Geometric mean pth root (E1*E2* …*Ep) Seconds pth root of the product of execution times of pprograms that constitute the benchmark Static instruction frequency % Occurrence of instruction i in compiled code Dynamic instruction frequency % Occurrence of instruction i in executed code Speedup (MA over MB) EB/EA Number Speedup of Machine A over B Speedup (improvement) EBefore/EAfter Number Speedup After improvement Improvement in Exec time (Eold-Enew)/Eold Number New Vs. old Amdahl’s law Timeafter = Timeunaffected  + Timeaffected/x Seconds x is amount of improvement

A 28 year old pregnant women (Ht= 5’5″; Wt= 60 kg; moderatel…

A 28 year old pregnant women (Ht= 5’5″; Wt= 60 kg; moderately active) at 20 weeks gestation with a single fetus provides the following daily food record. Breakfast Lunch Dinner 2 scrambled eggs 2 tsp butter 1 slice whole wheat toast 1 cup 2% milk Tuna Sandwich: 3 tsp mayo 2 slices whole wheat bread 3 oz tuna (in water) 1 medium apple 12 oz Coke 4 oz beef 1 cup potato 1/2 cup green beans 2 tsp butter 1 small banana 1 cup 2% milk This diet provides ADEQUATE amounts of which of the following nutrients?

PROJECT CRASHING PROBLEM (all time in Days, all Cost in $):…

PROJECT CRASHING PROBLEM (all time in Days, all Cost in $): What is the total crashing cost to crash the project by 4 days? Activity Immediate Predecessor Normal Time Crash Time Normal Cost Crash Cost A – 5 4 1000 1400 B – 3 3 800 – C A,B 3 1 600 900 D B 4 2 1600 2000 E C,D 5 3 800 1200 F E 2 1 1300 1400