Skip to content

Quiz Lookup

  • Home
  • Blog

Blog

A __________ kanban card identifies the part and quantity to…

A __________ kanban card identifies the part and quantity to be withdrawn from one workstation and moved to the next.

Published May 5, 2021
Categorized as Uncategorized

Which of the following characteristics is required for a kai…

Which of the following characteristics is required for a kaizen event team member?

Published May 5, 2021
Categorized as Uncategorized

After determining locations for necessary items, you want to…

After determining locations for necessary items, you want to make it easy to identify these items through the use of __________.

Published May 5, 2021
Categorized as Uncategorized

The four main categories for value stream icons are ________…

The four main categories for value stream icons are __________.

Published May 5, 2021
Categorized as Uncategorized

The __________ used in the production system is important be…

The __________ used in the production system is important because it represents the maximum amount of stock in work-in-process at any given time.

Published May 5, 2021
Categorized as Uncategorized

In preparation for mapping a value stream, a line balance ch…

In preparation for mapping a value stream, a line balance chart can be used to __________.

Published May 5, 2021
Categorized as Uncategorized

What is the main root cause analysis technique that is used…

What is the main root cause analysis technique that is used in the A3 problem-solving method?

Published May 5, 2021
Categorized as Uncategorized

Red tagging is a __________ measure during a Sort event.

Red tagging is a __________ measure during a Sort event.

Published May 5, 2021
Categorized as Uncategorized

The __________ is a tool used to communicate to workers on t…

The __________ is a tool used to communicate to workers on the production line the daily production schedule that will maintain level production.

Published May 5, 2021
Categorized as Uncategorized

The four common steps to bring changover time into single di…

The four common steps to bring changover time into single digits are applying parallel operations, substituting functional tooling, eliminating adjustments, and __________.

Published May 5, 2021
Categorized as Uncategorized

Posts pagination

Newer posts Page 1 … Page 51,647 … Page 58,688 Older posts
Powered by Studyeffect
  • Privacy Policy
  • Terms of Service
Quiz Lookup
Proudly powered by WordPress.