PROJECT CRASHING PROBLEM (all time in Days, all Cost in $): What is the EXACT SEQUENCE of activities to crash, to reduce the project by 4 days, at least cost? Activity Immediate Predecessor Normal Time Crash Time Normal Cost Crash Cost A – 5 4 1000 1400 B – 3 3 800 – C A,B 3 1 600 900 D B 4 2 1600 2000 E C,D 5 3 800 1200 F E 2 1 1300 1400
Blog
What volume of 6.0 M HNO3 would be needed to make 500 mL of…
What volume of 6.0 M HNO3 would be needed to make 500 mL of 0.50 M solution?
A pressure is recorded as 622 torr. What is this pressure in…
A pressure is recorded as 622 torr. What is this pressure in atm?
A solution is made by combining 4.00 g of sugar and 100 mL o…
A solution is made by combining 4.00 g of sugar and 100 mL of water (density = 1.00 g/mL). What is the concentration in % w/w?
Which of the following is the correct Lewis structure for C2…
Which of the following is the correct Lewis structure for C2H4?
Isotopes differ from each other in what way?
Isotopes differ from each other in what way?
Colloids can be stabilized by emulsifying agents.
Colloids can be stabilized by emulsifying agents.
If urine has a density of 1.08 g/mL, what would be the mass…
If urine has a density of 1.08 g/mL, what would be the mass of a 125 mL urine sample?
Given the following: heat of fusion of ice = 80.0 cal/g; spe…
Given the following: heat of fusion of ice = 80.0 cal/g; specific heat of ice = 0.480 cal/g; and specific heat of water = 1.00 cal/g. Calculate the amount of heat required to melt 30.0 g of ice at 0°C.
Which of the following gases would diffuse about one-third a…
Which of the following gases would diffuse about one-third as fast as helium gas, He?