In a __________ system, the overall production schedule is based exclusively upon forecasted sales.
Blog
Daily cleaning and inspection should be performed by _______…
Daily cleaning and inspection should be performed by __________.
A value stream box score is a tool for __________.
A value stream box score is a tool for __________.
__________ is a visual queuing system designed to simplify p…
__________ is a visual queuing system designed to simplify production scheduling and eliminate excess inventory.
Which of the following is an effective way to communicate ab…
Which of the following is an effective way to communicate about a kaizen event?
In a visual safety system, which of the following items woul…
In a visual safety system, which of the following items would be painted red with a big red circle around it?
In a Straightened workplace, __________ should be able to sp…
In a Straightened workplace, __________ should be able to spot abnormal conditions __________.
Wasteful setup activities include: __________.
Wasteful setup activities include: __________.
A future state value stream map has features such as _______…
A future state value stream map has features such as __________.
Determining the possible impact of a kaizen event on operati…
Determining the possible impact of a kaizen event on operations is an important step when __________.