A _____ might involve maximums for one or more resources, such as time, dollars, or people.
Blog
Microsoft’s risk management model includes _____, which spe…
Microsoft’s risk management model includes _____, which specifies the risk type.
The _____, named after a nineteenth-century economist, is a…
The _____, named after a nineteenth-century economist, is a widely used tool for visualizing issues that need attention and is drawn as a vertical bar graph.
The purpose of quantitative risk analysis is to understand…
The purpose of quantitative risk analysis is to understand the actual impact of a risk in terms of dollars, time, project scope, or quality.
In a sequence diagram, vertical arrows represent messages f…
In a sequence diagram, vertical arrows represent messages from one object to another.
A _____ is an analysis tool that represents the possible cau…
A _____ is an analysis tool that represents the possible causes of a problem as a graphical outline.
_____ limitations result when a system that was designed for…
_____ limitations result when a system that was designed for a specific hardware configuration becomes obsolete when new hardware is introduced.
In a use case diagram, the user becomes a(n) _____, with a…
In a use case diagram, the user becomes a(n) _____, with a specific role that describes how he or she interacts with a system.
If team members lack experience with certain aspects of the…
If team members lack experience with certain aspects of the required technology, temporary help might be obtained from IT consultants or part-time staff.
A _____ represents the work that one person can complete in…
A _____ represents the work that one person can complete in one day.