The objective of strategic capacity planning is to provide an approach for determining the overall capacity level of labor-intensive resources.
Blog
Assume there are five jobs (i.e., A, B, C, D, and E) that ne…
Assume there are five jobs (i.e., A, B, C, D, and E) that need to be sequenced in a production schedule. The remaining operating time necessary for completion of job A is 3 days (i.e., job A will take 3 more days to complete), B will take 9 days, C will take 6 days, D will take 5 days and E will take 8 days. Which job should be scheduled last if using the SOT priority rule for job sequencing?
In finite loading, no consideration is given directly to whe…
In finite loading, no consideration is given directly to whether there is sufficient capacity at the resources required to complete the work, nor is the actual sequence of the work as done by each resource in the work center considered.
Which of the following might be a status and exception repor…
Which of the following might be a status and exception report used in shop-floor control?
Using the cut-and-try method for aggregate operations planni…
Using the cut-and-try method for aggregate operations planning, we can back calculate beginning inventory if we know the values of other relevant variables. What was the initial inventory if the production requirement was 900, the demand forecast was 1,000, and the necessary safety stock was 20 percent of the demand forecast?
We usually associate the word “seasonal” with recurrent peri…
We usually associate the word “seasonal” with recurrent periods of repetitive activity that happen on other than an annual cycle.
Initiating performance of scheduled work is commonly termed…
Initiating performance of scheduled work is commonly termed “dispatching” of orders.
How do you say “please” in Spanish?
How do you say “please” in Spanish?
“A measure that is used to determine how many times the same…
“A measure that is used to determine how many times the same asset can be used to generate revenue and profit” is the definition of which of the following?
A job has 10 days of processing time left to do before compl…
A job has 10 days of processing time left to do before completion, and today is the 5th day of the month. If the job is due on the 15th day of the month, what is its critical ratio?