Assume you are sequencing jobs using Johnson’s rule. There are three jobs called A, B and C. The first step in assembling and the second step is painting. Job A requires 3 hours to assemble and 6 hours to paint. Job B requires 7 hours to assemble and 2 hours to paint. Job C requires 4 hours to assemble and 1 hour to paint. The objective is to minimize the total processing time of all jobs, using Johnson’s rule. What is the correct sequence to process the jobs?
Blog
The economic order quantity (EOQ) lot-sizing technique produ…
The economic order quantity (EOQ) lot-sizing technique produces or acquires exactly the amount of product that is needed each time period with none carried over into future periods.
Inventory is defined as the stock of any item or resource us…
Inventory is defined as the stock of any item or resource used in an organization.
Which of the following is not necessary to compute the order…
Which of the following is not necessary to compute the order quantity using the fixed-time-period model with safety stock?
When implemented correctly, MRP links all areas of the busin…
When implemented correctly, MRP links all areas of the business.
For a high-volume type of manufacturing, which of the follow…
For a high-volume type of manufacturing, which of the following is the typical production scheduling approach?
A company has a MAD of 10. It wants to have a 99.7 percent c…
A company has a MAD of 10. It wants to have a 99.7 percent control limit on its forecasting system. Its most recent tracking signal value is 3.1. What can the company conclude from this information?
¿Qué hora es? 7-58.png
¿Qué hora es? 7-58.png
If the intercept value of a linear regression model is 40, t…
If the intercept value of a linear regression model is 40, the slope value is 40, and the value of X is 40, which of the following is the resulting forecast value using this model?
Which of the following is not a lot-sizing technique used in…
Which of the following is not a lot-sizing technique used in MRP systems?