Explain briefly a) how the key aspects of the Lean Project D…

Explain briefly a) how the key aspects of the Lean Project Delivery System (LPDS)  such as its structure lead to better and more successful projects than traditional construction projects b) describe the role of the work structuring and production control elements..

A) Briefly explain the impact of wastes in design and constr…

A) Briefly explain the impact of wastes in design and construction projects, using the 7 basic wastes as a reference Explain why they are considered to be wastes. (Do not include material waste) B) Provide two (2) examples of waste in design projects. Also describe 2 examples in the construction phase.