Pack’d is a producer of Backpacks and Lunch boxes. Relevant data on the bottleneck operation in the shop for the upcoming fiscal year are given in the following table: Item Backpacks Lunch boxes demand forecast 30,000 units/yr 15,000 units/yr lot size 20 units 60 units standard processing time 0.4 hours/unit 0.5 hours/unit standard setup time 3 hours/lot 4 hours/lot The shop works two shifts per day, 8 hours per shift, 180 days per year. Currently, the company operates [x] machines. The utilization rate of the shop is __________% (enter response rounded to two decimal places. For 10% enter 10).
Blog
The objective of a firm in a responsive supply chain is like…
The objective of a firm in a responsive supply chain is likely to be realized if it has a:
The mechanism of action of cromolyn sodium (Intal) is to
The mechanism of action of cromolyn sodium (Intal) is to
Regarding the measurement of capacity, when a firm provides…
Regarding the measurement of capacity, when a firm provides a relatively small number of standardized products and services (e.g., most of its products are not standardized):
Which of the following does NOT generate pressure to decreas…
Which of the following does NOT generate pressure to decrease inventories?
Based on the Wal-Mart case details and in-class discussions,…
Based on the Wal-Mart case details and in-class discussions, which of the two distribution methods designs (i.e., cross dock or staple stock) is more reflective of a responsive supply chain? Recall that with cross dock inventory is sent directly to the Wal-Mart stores. With staple stock, the inventory is temporarily housed in a warehouse.
Which of the following does NOT generate pressure to increas…
Which of the following does NOT generate pressure to increase inventories?
Which of the following are potential consequences of water d…
Which of the following are potential consequences of water deficiency in animals? (Select all that apply)
Pack’d is a producer of Backpacks and lunch boxes. Relevant…
Pack’d is a producer of Backpacks and lunch boxes. Relevant data on the bottleneck operation in the shop for the upcoming fiscal year are given in the following table: Item Backpacks Lunch boxes demand forecast 30,000 units/yr 15,000 units/yr lot size 20 units 60 units standard processing time 0.4 hours/unit 0.5 hours/unit standard setup time 3 hours/lot 4 hours/lot The shop works two shifts per day, 8 hours per shift, 180 days per year. Currently, the company operates [x] machines, and desires a 25 percent capacity cushion. How many machines should be purchased to meet the upcoming year’s demand without resorting to any short-term capacity solutions?
Tom Bergman, owner and operator of the Earplug Superstore, i…
Tom Bergman, owner and operator of the Earplug Superstore, is reviewing the costs associated with the store’s best-selling hearing aid, the BZ15. The data available to Dr. Bergman concerning this device follow. Demand = 10 units/week Order cost = $3/order Holding cost = $1/unit/year The Earplug Superstore operates 52 weeks a year. If Tom decides to order at the economic order quantity, what is the sum of the annual ordering cost and holding cost?