An Implementation Engineer is going on site to complete a data pack evacuation and perform a hardware NDU.At what step should the Implementation Engineer contact support for assistance?
Blog
Prior to installing a new FlashArray controller, which termi…
Prior to installing a new FlashArray controller, which terminal display settings must the Implementation Engineer configure?
What is the rack unit height of a FlashArray//XL?
What is the rack unit height of a FlashArray//XL?
An Implementation Engineer is installing the first DirectFla…
An Implementation Engineer is installing the first DirectFlash Shelf (DFS) on a FlashArray//XR4 controller. Which ports should the Implementation Engineer use for the connection?
An Implementation Engineer is performing a capacity consolid…
An Implementation Engineer is performing a capacity consolidation at a customer site. Since there is NOT enough space on the array to evac the chassis data packs, the Implementation Engineer has to move the chassis drives to a shelf one drive at a time. What steps should the Implementation Engineer take to achieve this?
Which command should an Implementation Engineer run to deter…
Which command should an Implementation Engineer run to determine controller status?
Where can the NVRAM on a FlashArray//E be located?
Where can the NVRAM on a FlashArray//E be located?
What is the longest supported cable length for use with DFS…
What is the longest supported cable length for use with DFS shelves?
For a new FlashArray installation, a customer’s network team…
For a new FlashArray installation, a customer’s network team has NOT provisioned network ports for management connectivity. How will this affect the installation process?
What interface names are assigned to the 4-port Fibre Channe…
What interface names are assigned to the 4-port Fibre Channel card installed in slot 1 of a FlashArray//XR4?