Name two of the three tasks that can be assigned to the DP in the Programming (Planning) Phase of a project.
Author: Anonymous
One of the things that an owner likes about the delivery sys…
One of the things that an owner likes about the delivery system of Question #16 better than the delivery system of Question #21 is that with this system, they have a ____________________ point of contact with contractor / CM personnel.
With the dawning of the new age in the 1930s, a new delivery…
With the dawning of the new age in the 1930s, a new delivery system came into being. This delivery system is most commonly known as the __________________________________ Delivery system.
Name two tasks that the DP can perform during the Design Pha…
Name two tasks that the DP can perform during the Design Phase.
The AASHO Road Tests ushered in the Age of _________________…
The AASHO Road Tests ushered in the Age of _________________________________. How did they do this?
We discussed eight reasons that owners prefer Design-Build (…
We discussed eight reasons that owners prefer Design-Build (D-B) to Design-Bid-Build. List four of them.
Of these 10 types of people (referred to in Question 5), whi…
Of these 10 types of people (referred to in Question 5), which kind is USUALLY the instigator of the project?
Proponents of 3P claim that this delivery system offers inno…
Proponents of 3P claim that this delivery system offers innovation through four channels. Name two of these channels (hint: we refuted all four of these in class).
Describe why it could be said that the emergence of the Desi…
Describe why it could be said that the emergence of the Design-Build delivery system in the 1990s was “Back to the Future.”
Explain the difference between a PM and a CM. Please use al…
Explain the difference between a PM and a CM. Please use all of the things that we discussed – not just one difference