Write in the proper box below what I would need to include for validation text to specify that the on hand units must be between 0 and 20.Field Size Format Input Mask Caption Default Value Validation Rule Validation Text Required Allow Zero Length Indexed
Author: Anonymous
Underground conductors emerging from underground shall be in…
Underground conductors emerging from underground shall be in enclosures or raceways and shall be so enclosed to a point at least____’ above finished grade.
Overhead service drop conductors may be ____ and covered.
Overhead service drop conductors may be ____ and covered.
Switching devices shall be located at least____’ horizontall…
Switching devices shall be located at least____’ horizontally from the inside edge of a swimming pool.
Support for wiring located within the cavity of a fire-rated…
Support for wiring located within the cavity of a fire-rated ceiling____.
Equipment mounted to a grounded metal rack____.
Equipment mounted to a grounded metal rack____.
For final wiling purposes, a building under construction may…
For final wiling purposes, a building under construction may be considered a_____ location.
The branch circuit load for a 15 kW 110/220 V household elec…
The branch circuit load for a 15 kW 110/220 V household electric range is____ A.
For circuits supplying loads consisting of motor-operated ut…
For circuits supplying loads consisting of motor-operated utilization equipment that is fastened in place and that has a motor larger than___ HP in combination with other loads, the total computed load shall be based on 125% of the largest motor plus the sum of the other loads.
“In sight from” means visible at no less than_____’.
“In sight from” means visible at no less than_____’.