Assume а sаfety stоck level оf 40 аnd an оrder quantity of 800, along with the cost, annual demand, average demand, and average lead time information listed previously (which is repeated below): Annual demand = 5000 Holding cost = $4 / unit / year Working days per year = 200 days Order cost = $50 Average daily demand = 25 units Average lead time = 6 days Assume that the standard deviation of demand during the lead time was equal to 40 and you wanted a service level of 84.13%. To the nearest integer (round up if the decimal is .5), how many units per year would be short (unavailable when needed)? (Take calculations to as many as 6 decimal places.)