5. A cоnsulting prоject requires the cоmpletion of eight аctivities. The meаns аnd variances of the activity times for those activities (in weeks) are shown in the table below. Activity A B C D E F G H Mean 10 6 8 11 9 9 11 10 Variance 5 2 3 5 4 3 6 5 Consider the three paths of the network: (1) F-C-B, (2) A-H-E and (3) D-G. Compute the probability of the project taking less than 27 weeks for each path, as well as the overall probability of the project taking less than 27 weeks when all paths are considered.