3. (10pts) The prоductiоn mаnаger fоr Dolly Pаrton’s touring crew hires an Industrial Engineer (IE) to study how long it takes Dolly to prepare for a concert. Dolly is known for her excellent performance skills, good effort, average consistency, and good condition. a. (5pts) Using the Westinghouse rating tables, determine Dolly Parton’s rating performance? Rate Dolly overall. Justify your answer.  b. (5pts) The IE observes that it takes Dolly 20 minutes to do a final wardrobe check and prep before going on stage. Using your rating on part a, what is the normal time for this task? State any assumptions and justify your answer.