What was the % increase in the force of contraction at the m…

What was the % increase in the force of contraction at the maximal tetanic contraction over the single twitch?  [x] %. Round to the nearest whole number and enter the number only in the answer box.   Use the formula below and the values from the previous question. % Increase with tetanus  = {[(Tetananized contraction force) – (Single Twitch contraction force)] / (Single Twitch contraction force)} Multiply result by 100 to get percent.  

Beat Corporation uses a job-order costing system with a sing…

Beat Corporation uses a job-order costing system with a single plantwide predetermined overhead rate based on machine-hours. The company based its predetermined overhead rate for the current year on the following data:   Total machine-hours 40,000 Total fixed manufacturing overhead cost $344,000 Variable manufacturing overhead per machine-hour $ 3.90 Recently, Job M759 was completed. It required 60 machine-hours. The amount of overhead applied to Job M759 is closest to: (Round your intermediate calculations to 2 decimal places.)                        A)   $750                     B)   $516            C)   $984            D)   $234